APPLY
https://accessblue.com.au/apply/
PROJECT
New South Wales requires fast start gas-fired generation to balance the energy system and we have responded with the Tallawarra B project. The project is the development of a fast-start open cycle power station, which in peak periods will deliver reliable power to an additional 150,000 New South Wales homes. Its construction will create 250 jobs.
Located on the shores of Lake Illawarra at EnergyAustralia’s existing Tallawarra power station, Tallawarra B will be Australia’s first peaking power station to be powered by a blend of gas and green hydrogen with direct emissions offset. The Tallawarra B project will be ready for the summer of 2023-24, providing a new energy source following the retirement of the Liddell power station.
With its fast-start flexible capacity, the Tallawarra B project will play a vital role in maintaining system security, complementing renewables coming into the system, and providing reliable power to customers in New South Wales.
SCOPE
3-4 month turnaround/shutdown Wollongong NSW.
- Advanced Scaffolders
- Advanced Riggers
- Gantry Crane Operators
- Mechanical Fitters
- Carpenters
- Boilermaker Welders
- Trades Assistants
REQUIRED
- Working at Heights (within 2 years)
- Confined Space Entry (within 2 years)
- Gas Testing Atmosphere (within 2 years)
- Basic Fire (within 2 years)
- High Risk Work License – Advanced Rigging and Scaffolding
- Proof of right to work in Australia
- Strong and positive attitude towards safety
- Ability to work as part of a team
- Excellent communication and interpersonal skills
E.O.I. Apply here
https://accessblue.com.au/apply/